Fan Niroo
Home Page > About Us 

About Fan Niroo Group

Welcome To Our Group

Fan Niroo Group was formed in 2009 in partnership with companies Fan Niroo Co., Mellat Trading Co., Fan Jooyan Pars Niroo Co., PetroA1 Co. and Avin Palayesh Niroo Co. to develop capacities and capabilities of companies in Oil& Gas Industry.

Fan Niroo’s experience in desalination industry which is gained though many years, in addition of young and creative work labor of subsidiaries and, the help of Melat Trading company, and a construction with 20000 m3 workshop’s space, caused a really powerful and coherent Network.‬


History
  • 1991: First MED-TVC Desalination Package Manufactured in Iran by Kish Water & Power Co.
  • 1992: Establishment of “Fan Niroo” as Pioneer Company in Design & Manufacturing of Desalination Plants in Iran.
  • 1996: Fan Niroo Signs its first EPC Contract for 1000 m3/day MED-TVC with Kharg Petrochemical Co.
  • 1998: Operation of First Desalination Package Designed & Manufactured by Iranian Experts
  • 1999: Complete the Construction work of the #4 Shop in Boeein Zahra
  • 2000: “Mellat Trading” Company joint to Fan Niroo Co.

Parand 1

Main Factory

Fisrt Fan Niroo`s factory in parand industrial state.

Parand 2

Fan Jooyan Pars Niroo Factory

Second Fan Niroo Group factory which Fan Jooyan Pars Niroo built it.

Parand 3

The Bigest Factory

Equipped‬ factory with modern machine like Submerge, CNC cutting and ...

Boeen Zahra

The Oldest Factory

this factory is the first Factory in Fan Niroo Group which it was built in 2000

Shirin Noo

New Factory

Most of Fan Niroo Project are in Assaluyeh, This reason case of Fan Niroo build new factory in Assaluyeh.

A few word from our clients

We are very pleased that the MED sea water desalination unit with the capacity of 2400 m3/day, supplied by “Fan Niroo co.” installed at Lavan Island is running very smoothly and fulfill our requested requirements. The quality of workmanship together with accessories is very good and satisfactory.

The erection and commissioning are done by competent engineers and technicians. The performance of sea water desalination unit is well within the specified limits.

Provisional acceptance test was performed at 7th June 2009 and after one year on 7th 2010, the unit handed over to IOOC successfully.

The service support form the company is excellent.

Iranian Offshore Oil company
Lavan District Manager

M.Ebrahimi