2007
2008
2008
2008
2009
2010

2007

110,000 (BPD)

Manufacturing and installation of No.4 Desalting Vessels

Client: N.I.SO.C

Installation Site: Karanj Parsi, Khuzestan

Product: Crude Oil

2007

2008

55,000 (BPD)

Manufacturing the two stage Oil Desalting Package

Client: N.I.S.O.C

Installation Site: Rag Sefid , Khuzestan

Product: Crude Oil

2008

2008

4821 & 3832

Manufacturing the Indirect Oil Heater and Indirect Water Heater.

Client: N.I.S.O.C

Installation Site: Rag Sefid II, Khuzestan

Product: Crude Oil, Water Heater

2008

2008

33,000 (BPD)

Manufacturing the two stage Oil Desalting Package

Client: I.C.O.F.C

Installation Site: Sarvestan, Shiraz

Product: Crude Oil

2008

2009

5,000 m3

Site Preparation, Tank Manufacturing and Plant Commissioning

Client: I.O.O.C

Installation Site: Qeshm, Hormozgan

Product: Desalinated Water

 

 

2009

2010

220,000 (BPD)

Manufacturing of No. 8 Desalting Vessels

Client: N.I.S.O.C

Installation Site: Ahwaz Desalting, Khuzestan

Product: Crude Oil

2010